Burke, R D, Parrish, K and El Asmar, M (2018) Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction. Journal of Construction Engineering and Management, 144(05).

Delgado, L, Shealy, T, Garvin, M and Pearce, A (2018) Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes. Journal of Construction Engineering and Management, 144(05).

Doloi, H (2018) Community-Centric Model for Evaluating Social Value in Projects. Journal of Construction Engineering and Management, 144(05).

El-Sabek, L M and McCabe, B Y (2018) Framework for Managing Integration Challenges of Last Planner System in IMPs. Journal of Construction Engineering and Management, 144(05).

Farshchian, M M and Heravi, G (2018) Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation. Journal of Construction Engineering and Management, 144(05).

Liang, Q, Leung, M and Cooper, C (2018) Focus Group Study to Explore Critical Factors for Managing Stress of Construction Workers. Journal of Construction Engineering and Management, 144(05).

Lines, B C and Ravi Kumar, G G (2018) Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores. Journal of Construction Engineering and Management, 144(05).

Mahpour, A and Mortaheb, M M (2018) Financial-Based Incentive Plan to Reduce Construction Waste. Journal of Construction Engineering and Management, 144(05).

Nguyen, D A, Garvin, M J and Gonzalez, E E (2018) Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts. Journal of Construction Engineering and Management, 144(05).

Rocha, C G d, Anzanello, M J and Gerchman, M (2018) Method to Assess the Match between Clients’ Input and Decoupling Points in Customized Building Projects. Journal of Construction Engineering and Management, 144(05).

Schuldt, S and El-Rayes, K (2018) Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks. Journal of Construction Engineering and Management, 144(05).

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of Enablers and Constraints of Risk Allocation Using Structuration Theory in the Construction Industry. Journal of Construction Engineering and Management, 144(05).

Yap, J B H, Abdul-Rahman, H and Wang, C (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management, 144(05).

  • Type: Journal Article
  • Keywords: Project learning; Project communication management; Reusable project knowledge; Project performance; Malaysia;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001456
  • Abstract:
    Failure to communicate effectively and poor project knowledge continue to plague the construction industry, particularly concerning delay management and cost control. This paper aims to empirically examine the influence of project communication management and project learning as preventive measures to mitigate time-cost overruns. Based on a comprehensive literature review, a conceptual framework was developed. A two-stage data collection was used, namely semistructured interviews and a broad questionnaire survey. The qualitative data was analyzed by content analysis of critical incidents. Partial least-squared based structural equation modeling (PLS-SEM) analyses statistically tested the model hypotheses. The results suggest that project communications and project learning contribute positively to time-cost performance of construction projects. Effective communication tools, critical learning situations, and essential reusable project knowledge are identified. Collective sharing of experiences facilitates personal development and enables effective project learning. A triangulated approach was adopted to conceptualize the control loop-process emphasis on networking and communication, collaborative learning, experience accumulation, and expert judgment as critical elements of continuous learning. As such, this study advances the current knowledge of exploiting project communication management and project learning in mitigating time-cost overruns in construction.

Zhang, M, Cheng, W and Wang, Y (2018) Multiple-Fault Classification for Hot-Mix Asphalt Production by Machine Learning. Journal of Construction Engineering and Management, 144(05).